2020 BMW M2 CS

HOCKENHEIM SILVER METALLIC

History & Pricing Tools

AutoCheck score dial
98
90
95

This vehicle's AutoCheck Score: 98

Similar vehicles usually range between 90-95.

The AutoCheck Score is based on a vehicle's history such as vehicle class and age, number of owners, accident and damage history, title brands, odometer readings etc. This score is used to compare vehicle's favorability against the entire market of vehicles with the same scoring system.

  • AutoCheck iconTitle -
  • AutoCheck iconAccident / Damage -
  • AutoCheck iconInsurance Loss / Transfer -
  • AutoCheck iconOdometer -
  • AutoCheck iconRecalls -

Features

Exterior
Hockenheim Silver Metallic
Interior
Anthracite
Drivetrain
Rear Wheel Drive
Engine
3.0L 6 Cylinders
Horsepower
444 hp @ 6250 rpm
Torque
406 lb-ft @ 2350 rpm
Transmission
Manual
Style
CS Coupe

Included Packages & Options

Option
Original
MSRP ($)
ANTHRACITE, ALCANTARA/LEATHER UPHOLSTERY
Included
HOCKENHEIM SILVER METALLIC
$550
TIRES: 245/35R19 FR & 265/35R19 RR
Pilot Sport Cup 2
Included
TRANSMISSION: 6-SPEED MANUAL
Included
WHEELS: 19'' X 9'' FR/19'' X 10'' RR M GOLD MATT (1TQ)
Light Alloy Y-Spoke
Style 763M
Included
WHEELS: 19'' X 9'' FR/19'' X 10'' RR M JET BLACK
Light Alloy Y-Spoke
Style 763M
Included
Total Added Value
$550

Description

The Carfax 1-Owner 2020 BMW M2 CS Coupe is a fusion of performance and luxury, epitomized by its striking exterior color of Hockenheim Silver Metallic. This limited-edition model is designed for those who crave an unforgettable driving experience, thanks to its 3.0L 6-cylinder engine delivering exhilarating power and performance. The elegance continues inside with the Anthracite interior, where sportiness meets sophistication, ensuring both driver and passengers travel in comfort and style.

The M2 CS Coupe is not just about looks; it's engineered for driving purists. Equipped with a manual transmission, this vehicle offers an authentic connection with the road that driving enthusiasts will undoubtedly appreciate. Enhanced with M Carbon Ceramic Brakes, the M2 CS guarantees superior braking performance and durability, providing added confidence during spirited drives. Additionally, the M Double-Clutch Transmission with Drivelogic allows for smooth and responsive gear changes, optimizing both speed and efficiency on any journey.

This coupe also offers a selection of striking color options like Black Sapphire Metallic and Misano Blue Metallic, allowing owners to personalize their vehicle to reflect their unique style. With its combination of advanced engineering and luxurious design, the BMW M2 CS stands out in a crowded field of performance vehicles. Whether you're carving up canyon roads or cruising through city streets, this BMW promises to deliver an engaging and dynamic driving experience. As a Carfax 1-Owner vehicle, you can be assured of its impeccable condition, making it a perfect choice for discerning buyers in search of both performance and peace of mind.

Estimated Payment Calculator

Loan Amount
$72,876
Estimated Payment *
$0/mo
Credit Score
Below 579 23.90% APR
580 - 619 20.90% APR
620 - 679 12.90% APR
680 - 779 8.90% APR
Above 780 7.90% APR
Payment Terms
24 mo
36 mo
48 mo
60 mo
72 mo
Disclaimer

All Payments exclude government fees and taxes, any finance charges, any dealer document preparation charges, and any emission testing charges. The price for listed vehicles as equipped does not include charges such as: License, Title, Registration Fees, State or Local Taxes, Smog Fees, Credit Investigation, Optional Credit Insurance, Physical Damage of Liability Insurance, or Delivery Fees.

Specifications

Tire - Front: Tires - Front Performance
Tire - Rear: Tires - Rear Performance
Exterior
Auto On/Off Projector Beam Led Low/High Beam Auto-Leveling Daytime Running Lights Preference Setting Headlamps w/Delay-Off
Black Grille
Black Side Windows Trim and Black Front Windshield Trim
Body-Colored Door Handles
Body-Colored Front Bumper w/Carbon Fiber Bumper Insert
Body-Colored Rear Bumper w/Carbon Fiber Rub Strip/Fascia Accent
Carbon Fiber Power Heated Auto Dimming Side Mirrors w/Power Folding and Turn Signal Indicator
Composite/Galvanized Steel Panels
Fixed Rear Window w/Defroster
LED Brakelights
Light Tinted Glass
Lip Spoiler
Perimeter/Approach Lights
Speed Sensitive Rain Detecting Variable Intermittent Wipers w/Heated Jets
Tire Mobility Kit
Trunk Rear Cargo Access

Disclaimer

All advertised prices exclude government fees and taxes, any finance charges, any dealer document preparation charges, and any emission testing charges. While we try to make sure that all prices posted here are accurate at all times, we cannot be responsible for typographical and other errors that may appear on the site. We make every effort to provide you with the most accurate, up-to-the-minute information; however, it is your responsibility to verify with the Dealer that all details listed are accurate. The dealership is not responsible for typographical, pricing, product information, advertising, or shipping errors. Advertised prices and available quantities are subject to change without notice. All rates and offers are dependent on bank approval, which varies based on the applicant's credit as well as the vehicle.

Interested? Tap here for contact options.

Shopping Tools

Schedule a Test Drive

Please fill out the fields below
Verification Required

Text Link to Phone

Please fill out the fields below
Verification Required

Reserve Now

Please fill out the fields below
Verification Required
Your Request has been submitted successfully
Our team will contact you soon.
Unable to submit form

Ask a Question

Please fill out the fields below
Verification Required
Accessibility Widget Spinner: White decorative
Hide white left arrow Unhide